成人福利免费视频-成人福利视频-成人福利视频网-成人福利视频网站-成人福利视频网址-成人福利视频在线播放

Industry News
Location: Home>> News>>Industry News

Paper cup machine operation procedure

2022-07-18 14:50:54
0

is the norm for employees to < strong>Paper cup machine operation process, prevent the occurrence of safety and quality accidents, and ensure the smooth progress of production work, formulate this operation process:

1. Preparations before starting:

1. Before taking over the shift, the successor should receive the paper, cup bottom, carton, sealant, silicone oil and other materials required for the day, and check the received materials and the amount of materials remaining in the work, and report any problems in time.

2. Turn on the power button of the console, check whether the power of the machine is normal, and whether the set temperature can reach the predetermined value.

3. Add a small amount of lubricating oil to the moving parts of the machine for lubrication, and wipe the parts that the product needs to contact to avoid pollution. At the same time, check whether the connecting screws and jack screws of the running parts of the machine are loose.

4. Check the flatness of the paper, whether there are peeling, spots, front and rear confusion, wrinkling and other phenomena.

5. When necessary, spray an appropriate amount of water on the paper, and strictly control the time and humidity of the paper.

6. Check the air pressure valve and adjust it to the required pressure value according to regulations.

7. Put the bottom paper on the cup, pay attention to the front and back.

paper cup machine

2. Work when starting production:

1. After the preparatory work is completed, when starting the motor, shout to start without any response. (This is to prevent the operator from being invisible when repairing on the opposite side or behind the machine, causing unnecessary safety accidents).

2. Carefully observe the operation of the machine, take a cup to check the bonding effect of the paper cup, preheat, main heat, whether the knurling is yellow, and the paper cup is damaged.

3. Check the bonding effect of the bonding place, whether there is any indirect defect, the bonding firmness between the bottom of the cup and the bonding is tearing and pulling, and the indirect non-swabbing is a suspected leaking cup, which is subject to the water test.

4. During normal operation, if you find or feel that the machine is abnormal, you should lift the cup body first, and stop the inspection after the last cup is knurled.

5. If the machine is stopped unexpectedly in the middle, when the machine is restarted for a long time, take out the fourth .5 piece in the market and check whether the knurled part is bonded.

6. Paper Cup MachineThe operator should pay attention to the cup mouth, The shape of the cup body and the bottom of the cup, and the adhesion and size appearance of the cup body are checked from time to time.

7. If employees concentrate their energy during the operation and find abnormal sound or the bottom of the cup is poorly formed, they should stop the machine immediately to check to avoid greater losses.

8. Operators should be conscientious and responsible in the production process, and test the cups produced by themselves with boiling water every hour, 8 cups each time.

9. Before sealing the carton, the operator should conduct a sampling inspection of the number of small packages. After the sampling inspection is correct, cut out the product certificate or product pattern, paste it on the upper right corner of the left side of the carton, fill in the work number and production date in the box, and finally stack the sealed boxes neatly in the designated position.

3. Work after shutdown:

1. Turn off the power of the console, cut off the main power, close the air valve and the silicone oil valve.

2. Clean up residual paper scraps inside and outside the machine, and clean up auxiliary tools such as water spray guns.

3. Organize the work environment, clean and keep the equipment clean.

other:

1. Keep in mind the idea of safety first, and strictly follow the paper cup machine operating procedures operation, illegal operation is strictly prohibited.

2. Fill in the shift record form carefully before handover.

Tags

Dongguan Hongxin Machinery Manufacturing Co., Ltd.

Phone:13590316866 

Email:fullsailchina@163.com

Address:No. 9 Taicheng Road, Shajiao Community, Humen Town, Dongguan City, Guangdong Province

WeChat

中文字幕一区二区三区精彩视频 | 久久亚洲国产精品五月天婷 | 四虎影视成人永久免费观看视频 | 亚洲av日韩av高潮潮喷无码 | 99精品国产兔费观看66 | 77777亚洲午夜久久多人 | 三年片免费观看大全国语 | 久久久久久久女国产乱让韩 | 国产精品成人3p一区二区三区 | 精品国产乱码久久久久久一区二区 | 毛片a久久99亚洲欧美毛片 | 50岁老女人毛片一级亚洲 | 亚洲日韩国产一区二区三区 | 91老司机免费精品观看 | 欧美a级情欲片在线观看免费 | 欧美大黑帍在线播放 | 亚洲精品无码久久 | 色欲久久久天天天综合网精品 | 夜夜添无码一区二区三区 | 国产91色在线 | 亚洲 | 亚洲欧美日韩中文在线制服 | 野花社区视频在线观看 | 亚洲av永久无无码精品一区二区三区 | 又爽又高潮的bb视频免费看 | 激情影院内射美女 | 久久久无码精品亚洲日韩按摩 | 久久tv中文字幕首页 | 亚洲成a人片在线观看www | 中国老太卖婬hd播放 | 国产精品原创巨作av女教师 | 国产sm调教折磨视频 | 亚洲女女女同性video | 国产精品午夜小视频观看 | 亚洲av无码潮喷在线观看 | 久久人妻av无码中文专区 | 成人免费在线视频观看 | 91精品国产高清在线入口 | 国产又黄又爽又色的免费 | 48久久国产精品性色aⅴ人妻 | 亚洲av无码xxx麻豆艾秋 | 国产探花在线精品一区二区 |